CVE-2022-25790
Autodesk AutoCAD/Navisworks Boundary Overflow Vulnerability
Description
A maliciously crafted DWF file in Autodesk AutoCAD 2022, 2021, 2020, 2019 and Autodesk Navisworks 2022 can be used to write beyond the allocated boundaries when parsing the DWF files. Exploitation of this vulnerability may lead to code execution.
INFO
Published Date :
April 11, 2022, 8:15 p.m.
Last Modified :
April 19, 2022, 3:48 p.m.
Source :
[email protected]
Remotely Exploitable :
No
Impact Score :
5.9
Exploitability Score :
1.8
Affected Products
The following products are affected by CVE-2022-25790
vulnerability.
Even if cvefeed.io
is aware of the exact versions of the
products
that
are
affected, the information is not represented in the table below.
References to Advisories, Solutions, and Tools
Here, you will find a curated list of external links that provide in-depth
information, practical solutions, and valuable tools related to
CVE-2022-25790
.
URL | Resource |
---|---|
https://www.autodesk.com/trust/security-advisories/adsk-sa-2022-0005 | Vendor Advisory |
We scan GitHub repositories to detect new proof-of-concept exploits. Following list is a collection of public exploits and proof-of-concepts, which have been published on GitHub (sorted by the most recently updated).
Results are limited to the first 15 repositories due to potential performance issues.
The following list is the news that have been mention
CVE-2022-25790
vulnerability anywhere in the article.
The following table lists the changes that have been made to the
CVE-2022-25790
vulnerability over time.
Vulnerability history details can be useful for understanding the evolution of a vulnerability, and for identifying the most recent changes that may impact the vulnerability's severity, exploitability, or other characteristics.
-
CVE Modified by [email protected]
May. 14, 2024
Action Type Old Value New Value -
Initial Analysis by [email protected]
Apr. 19, 2022
Action Type Old Value New Value Added CVSS V2 Metadata Victim must voluntarily interact with attack mechanism Added CVSS V2 NIST (AV:N/AC:M/Au:N/C:P/I:P/A:P) Added CVSS V3.1 NIST AV:L/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:H Changed Reference Type https://www.autodesk.com/trust/security-advisories/adsk-sa-2022-0005 No Types Assigned https://www.autodesk.com/trust/security-advisories/adsk-sa-2022-0005 Vendor Advisory Added CWE NIST CWE-787 Added CPE Configuration OR *cpe:2.3:a:autodesk:advance_steel:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:advance_steel:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:advance_steel:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:advance_steel:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad:*:*:*:*:*:macos:*:* versions from (including) 2022 up to (excluding) 2022.2.2 *cpe:2.3:a:autodesk:autocad_architecture:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_architecture:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_architecture:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_architecture:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_electrical:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_electrical:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_electrical:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_electrical:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_lt:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_lt:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_lt:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_lt:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_map_3d:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_map_3d:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_map_3d:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_map_3d:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_mechanical:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_mechanical:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_mechanical:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_mechanical:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_mep:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_mep:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_mep:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_mep:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:autocad_plant_3d:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:autocad_plant_3d:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:autocad_plant_3d:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:autocad_plant_3d:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:civil_3d:*:*:*:*:*:*:*:* versions from (including) 2019 up to (excluding) 2019.1.4 *cpe:2.3:a:autodesk:civil_3d:*:*:*:*:*:*:*:* versions from (including) 2020 up to (excluding) 2020.1.5 *cpe:2.3:a:autodesk:civil_3d:*:*:*:*:*:*:*:* versions from (including) 2021 up to (excluding) 2021.1.2 *cpe:2.3:a:autodesk:civil_3d:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.1.2 *cpe:2.3:a:autodesk:navisworks:*:*:*:*:*:*:*:* versions from (including) 2022 up to (excluding) 2022.2
CWE - Common Weakness Enumeration
While CVE identifies
specific instances of vulnerabilities, CWE categorizes the common flaws or
weaknesses that can lead to vulnerabilities. CVE-2022-25790
is
associated with the following CWEs:
Common Attack Pattern Enumeration and Classification (CAPEC)
Common Attack Pattern Enumeration and Classification
(CAPEC)
stores attack patterns, which are descriptions of the common attributes and
approaches employed by adversaries to exploit the CVE-2022-25790
weaknesses.
Exploit Prediction
EPSS is a daily estimate of the probability of exploitation activity being observed over the next 30 days.
0.14 }} 0.07%
score
0.51240
percentile