0.0
NA
CVE-2026-52980
sched/fair: Clear rel_deadline when initializing forked entities
Description

In the Linux kernel, the following vulnerability has been resolved: sched/fair: Clear rel_deadline when initializing forked entities A yield-triggered crash can happen when a newly forked sched_entity enters the fair class with se->rel_deadline unexpectedly set. The failing sequence is: 1. A task is forked while se->rel_deadline is still set. 2. __sched_fork() initializes vruntime, vlag and other sched_entity state, but does not clear rel_deadline. 3. On the first enqueue, enqueue_entity() calls place_entity(). 4. Because se->rel_deadline is set, place_entity() treats se->deadline as a relative deadline and converts it to an absolute deadline by adding the current vruntime. 5. However, the forked entity's deadline is not a valid inherited relative deadline for this new scheduling instance, so the conversion produces an abnormally large deadline. 6. If the task later calls sched_yield(), yield_task_fair() advances se->vruntime to se->deadline. 7. The inflated vruntime is then used by the following enqueue path, where the vruntime-derived key can overflow when multiplied by the entity weight. 8. This corrupts cfs_rq->sum_w_vruntime, breaks EEVDF eligibility calculation, and can eventually make all entities appear ineligible. pick_next_entity() may then return NULL unexpectedly, leading to a later NULL dereference. A captured trace shows the effect clearly. Before yield, the entity's vruntime was around: 9834017729983308 After yield_task_fair() executed: se->vruntime = se->deadline the vruntime jumped to: 19668035460670230 and the deadline was later advanced further to: 19668035463470230 This shows that the deadline had already become abnormally large before yield_task_fair() copied it into vruntime. rel_deadline is only meaningful when se->deadline really carries a relative deadline that still needs to be placed against vruntime. A freshly forked sched_entity should not inherit or retain this state. Clear se->rel_deadline in __sched_fork(), together with the other sched_entity runtime state, so that the first enqueue does not interpret the new entity's deadline as a stale relative deadline.

INFO

Published Date :

June 24, 2026, 4:28 p.m.

Last Modified :

June 24, 2026, 4:28 p.m.

Remotely Exploit :

No

Source :

Linux
Affected Products

The following products are affected by CVE-2026-52980 vulnerability. Even if cvefeed.io is aware of the exact versions of the products that are affected, the information is not represented in the table below.

No affected product recoded yet

Solution
Clear the rel_deadline field in __sched_fork() to prevent crashes.
  • Update the Linux kernel to a patched version.
  • Ensure sched_entity state is properly cleared on fork.
  • Verify rel_deadline is not inherited by forked entities.
  • Prevent unexpected NULL dereferences during scheduling.

We scan GitHub repositories to detect new proof-of-concept exploits. Following list is a collection of public exploits and proof-of-concepts, which have been published on GitHub (sorted by the most recently updated).

Results are limited to the first 15 repositories due to potential performance issues.

The following list is the news that have been mention CVE-2026-52980 vulnerability anywhere in the article.

EPSS is a daily estimate of the probability of exploitation activity being observed over the next 30 days. Following chart shows the EPSS score history of the vulnerability.